Installation Instructions Chapter 1
1-2 Introduction
Chapter Summaries
The following is a brief description of each chapter in this book:
• Chapter 1 - Introduction: This chapter provides a brief description
of each chapter in this book and lists additional DecisioNet System
documents that are available.
• Chapter 2 - Pre-Installation Procedures: This chapter provides a
overview of the planning and installation process. It breaks down
the DecisioNet implementation into six phases and lists the major
tasks to be performed during each phase.
• Chapter 3 - Preparing the Installation Site: This chapter lists the
customer responsibilities, power and environmental requirements,
as well as the DecisioNet hardware specifications.
• Chapter 4 - Installing the Hardware Infrastructure: This chapter
describes how to prepare the CBS(s) and RS-232/RS-422 Converter
for installation. It also contains instructions for installing and
cabling the CBSs, converter, power supplies, and antennas.
• Chapter 5 - DecisioNet Software on a Windows NT System: This
chapter contains software installation instructions specific to a
Windows NT operating system.
• Chapter 6 - DecisioNet Software on an NCR UNIX System: This
chapter contains software installation instructions specific to an
NCR UNIX operating system.
• Chapter 7 - DecisioNet Software on an SCO UNIX System: This
chapter contains software installation instructions specific to an
SCO UNIX operating system.
• Chapter 8 - Configuring the DecisioNet System Environment: This
chapter describes how to configure the installed DecisioNet
software on Windows NT, NCR UNIX, and SCO UNIX operating
systems.