Installation Manual
Manuals
Brands
NavePoint Manuals
Accessories & Supplies
NavePoint 7ft Open Frame 19" 42U 2-Post Network Server Relay Rack Rolling with Casters
1
2
3
1
2
Attach Bot
tom Cross Bar (A) a
t the bot-
tom of
the two
V
ertical R
ails (C) using 8
M6 Screws (F) and 8 M6 Flange Nuts (G).
Attach
T
op Cross Bar (D) at the top of the
two V
ertical R
ails (C) using 8 M6 Screws
(F) and 8 M6 Flange Nuts (G).
1
2
3