Installation Manual
www.NavePoint.com 8 customerservice@navepoint.com
D
Detail A
Detail B
Rotate the frame built in Step C (as shown in the picture above).
Insert the frame built in Step B to the frame built in Step C and fasten with four M8 x 16mm Hex Bolts (I) using M8
Wrench (M). Bolts should be fixed in place, but not completely tightened
Place the rack upright on a level surface and confirm that the rack is stable. Tighten all nuts and bolts until fully secure.