Installation Manual
www.NavePoint.com 7 customerservice@navepoint.com
A: Insert the Base Bracket (C) between the assembled bottom section and Left (A) /Right Vertical Rail (B) and fasten
with two M8 x 16mm Hex Bolts (I) using M8 Wrench (M). Bolts should be fixed in place, but not completely tightened
B: Insert the Top bracket (H) between the assembled top section and Left (A) /Right Vertical Rail (B) and fasten with two
M8 x 16mm Hex Bolts (I) using M8 Wrench (M). Bolts should be fixed in place, but not completely tightened