Installation Manual
www.NavePoint.com 5 customerservice@navepoint.com
B
2X
Detail A
Detail B
Lay out a left vertical rail (A), a right vertical rail (B), one of the assembled top sections and one of the assembled bottom
sections in a rectangle on the floor or other flat surface. Place all the pieces facedown. The assembled top and bottom
sections are facedown when the inserted bolt heads are facedown. The vertical rails are facedown when the rails are
lying flat on the side that has keyhole mounting slots. Connect the ends of the top and bottom sections with four M8 x
16mm Hex Bolts (I) using M8 Wrench (M). Bolts should be fixed in place, but not completely tightened
Repeat the process to build another frame.