Installation Manual
www.NavePoint.com 8 customerservice@navepoint.com
-Squared Hole Mounting
1 Locate the numbered square openings in the mounting rails where you plan to install your equipment. You will install
cage nuts (included) into the square openings in order to provide an attachment point for the mounting screws
(included). Note: Consult your equipment documentation to determine how many cage nuts will be required and where
they will need to be installed.
a-From the inside of the mounting rail, insert one of the flanges of the cage nut through the square opening. Press it
against the side of the square opening. Each flange should engage one side of the square opening, not the top or bottom.
b-Compress the cage nut at the sides slightly to allow the remaining flange to fit through the square opening. When the
cage nut is properly installed, both flanges will protrude through the square opening and will be visible on the outer
surface of the mounting rail. Repeat steps 1a and 1b until all required cage nuts are installed.
2 After installing the required cage nuts, use the included black mounting screws and cup washers to secure your
equipment to the rack rail. Place the cup washers between the screws and the equipment mounting brackets.
-Tapped Hole Mounting
Use the included silver mounting screws to secure your
equipment to the rack rail. Place washers between the
screws and the equipment mounting brackets.