Installation Sheet
INSTALLATION INSTRUCTIONS
WALL MOUNT VANITIES
It is srongly recommended that Native Trails wall mount
vanities are installed by a licensed contractor.
FRENCH
CLEAT
WALL
MOUNT
VANITY
BORDEAUX WALL MOUNT, CHARDONNAY
AND CABERNET FLOATING VANITY
1. Determine desired height and location of studs in wall.
2. Attach French Cleat (B) to wall using 3.5” screws, making sure
slanted edge will t evenly with French Cleat (A). Make sure it is
level and at proper height to support vanity.
3. Hang vanity on French Cleat (B) attached to wall.
4. From underneath vanity, install 3.5” wood screws through
vanity and into French Cleat (B) to secure vanity.
5. Install top, sink, and drain according to installation instructions.
ZACA WALL MOUNT
1. Determine desired height and location.
2. Remove drywall and install blocking support according to
Figure 1. Install 4x8 wood blocking between each stud to the
full length of Zaca Wall Mount; 3 blocks for 36” Zaca Wall
Mount, 4 blocks for 48”. Attach blocking to studs with Simpson
A34 brackets (not supplied) on top and bottom of each
block as shown in Figure 1. Front face of blocking should
be ush with front face of stud.
3. Replace drywall, marking location of installed blocking.
Patch drywall as needed.
4. Using Zaca Wall Mount as a template, mark mounting holes.
5. Using a 1/4” drill bit, pre-drill mounting holes into installed wall
blocking for 3/8” lag bolts (not supplied).
6. Attach Zaca Wall Mount to wall according to Figure 2.
7. Install NativeStone
®
Trough sink and drain according to
installation instructions.
WALL
Figure 1. (front view)
WALL
STUD
SIMPSON
BRACKETS
4x8 WOOD
BLOCKING
ZACA
WALL
MOUNT
Figure 2. (top view)
(2) 3/8” x 5” LAG BOLTS
4 TOTAL FOR 36”
6 TOTAL FOR 48”
(A)
(B)