Instructions / Assembly
2
This should be easy, just follow
our instructions and you will be
back to Netflix in no time.
Ok, let’s
get rolling
What’s included
What you need
• Some of your favourite bubbly
or your preferred relaxant
• Use the packaging carton as
a working surface to prevent
product damage during assembly
• Phillips head screwdriver
(not included)
• Drill (not included)
• 1/4” Drill bit (not included)
• 5/16” Drill bit (not included)
Description Qty
A Shelf 2
B Writing Panel 1
C Left & Right Upper Metal Support 2
D Left Lower Metal Support 1
E Right Lower Metal Support 1
F Metal Support Frame 1
1 M6*15mm Bolt 12
2 M6*35mm Bolt 4
3
M4.2*32mm Screw for
Non-drywall Anchor
4
4 M6*30mm Non-drywall Anchor 4
5 Allen Key 1
6 Drywall Anchor 4
7
M4.2*50mm Screw for
Drywall Anchor
4
30:00
Estimated time for assembly
55
lbs per shelf
Weight Limitation
Toll-free at 1-866-619-1004
Help@nathanjames.com
Nathanjames.com/help
Scan me!
Inspiration
Digital Instructions
Free Lifetime Warranty