Installation Guide

2
W415-0794 / B / 11.03.10
NOTE: Changes, other than editorial, are denoted by a line in the margin.
TABLE OF CONTENTS
1.0 INSTALLATION OVERVIEW 3
2.0 INTRODUCTION 4
2.1 DIMENSIONS 5
2.2 GENERAL INSTRUCTIONS 5
2.3 GENERAL INFORMATION 6
2.4 RATING PLATE INFORMATION 7
3.0 VENTING 8
3.1 VENTING LENGTHS AND COMPONENTS 9
3.2 VENT TERMINAL CLEARANCES 10
3.3 HORIZONTAL TERMINATION 11
3.4 VERTICAL TERMINATION 12
4.0 INSTALLATION 13
4.1 WALL AND CEILING PROTECTION 13
4.2 HORIZONTAL INSTALLATION 14
4.3 VERTICAL INSTALLATION 14
4.4 USING FLEXIBLE VENT COMPONENTS 15
4.4.1 HORIZONTAL AIR TERMINAL INSTALLATION 15
4.4.2 VERTICAL AIR TERMINAL INSTALLATION 16
4.4.3 APPLIANCE VENT CONNECTION 17
4.5 GAS INSTALLATION 17
4.6 MOBILE HOME 18
5.0 FRAMING 19
5.1 MINIMUM CLEARANCE TO COMBUSTIBLES 20
5.2 MINIMUM ENCLOSURE CLEARANCES 21
5.3 NAILING TAB INSTALLATION 22
5.4 STAND-OFF ASSEMBLY 22
6.0 FINISHING 23
6.1 MOUNTING CABINET INSTALLATION 23
6.2 DOOR REMOVAL 25
6.3 FRAME/FRONT INSTALLATION 26
6.4 ACCENT GLASS INSTALLATION 27
6.5 LK8 LIGHT INSTALLATION (OPTIONAL) 27
7.0 ELECTRICAL INFORMATION 28
7.1 HARD WIRING CONNECTION 28
8.0 OPERATION 29
9.0 ADJUSTMENTS 30
9.1 GAS PRESSURE ADJUSTMENT 30
9.2 VENTURI ADJUSTMENT 30
9.3 FLAME CHARACTERISTICS 30
10.0 MAINTENANCE 31
10.1 CARE OF GLASS 31
10.2 DOOR GLASS REPLACEMENT 32
11.0 REPLACEMENTS 33
12.0 TROUBLE SHOOTING 36
13.0 WARRANTY 38
14.0 SERVICE HISTORY 39