Installation and Operation Manual

Table Of Contents
W415-2212 / C / 03.06.18
EN
4
table of contents
1.0 dimensions 5
2.0 general information 6
2.1 listing approvals 6
2.2 general instructions 6
2.3 rating plate information 7
2.4 hardware list 7
2.5 label location 8
3.0 location 9
3.1 unpacking and testing the appliance 9
3.2 grounding the appliance 9
4.0 installation 10
4.1 minimum clearance to combustibles
10
4.2 minimum mantel clearances 10
4.3 installing the appliance onto the wall
11
4.4 recessing the appliance into the wall
13
4.4.1 trim installation (recessed
installation only) 14
4.4.2 installing the appliance into
a mantel 15
4.5 120V hard wiring installation 16
4.5.1 NEFL32/42/50/60/74/100CHD
120V hardwiring 16
4.5.2 NEFL32/42/50/60/74/100CHS
120V hardwiring 17
4.6 240V hard wiring installation
(NEFL32/42/50/60/74/100CHD
only) 18
Changes, other than editorial, are denoted by a vertical line in the margin.
note:
5.0 framing - recessed installation 20
6.0 finishing 21
6.1 crystal ember installation 21
6.2 optional topaz glass chips and drift
wood log installation 21
6.3 front glass installation and removal 22
7.0 wiring diagram 23
8.0 operation 25
8.1 operating control panel 25
8.2 operating remote control 26
9.0 maintenance 27
9.1 remote battery installation 27
10.0 replacements 28
10.1 NEFL32/42/50/60/74/100CHS 29
10.2 NEFL32/42/50/60/74/100CHD 30
11.0 troubleshooting 31
12.0 warranty 32
13.0 notes 33