User Manual
22
www.napoleon.com
N415-0562-AU JUN 17.20
Install baeries as illustrated. Plug wire from LED (lights) located underneath
control panel into wire from baery pack. Ensure wires do not come in contact
with the boom of the grill. The baery pack module must be mounted inside
the enclosure, at least 8 inches (20cm) below the boom of the drip pan, to
prevent the module from overheang. Ensure wires and module do not interfere
with drip pan removal.
!
1
2
3
4
Drip Pan