User's Manual

Trilogy Networxâ„¢ Wireless Setup & DL-Windows Configuration Instructions 11
Hardware Installation (cont'd)
door before installing the lock. We supply a "Class 2"
6V power supply (never substitute power supplies; use
only the supplied unit) that is wired to the terminal strip
located on the Gateway PC board. Wiring is non-
polarized, so connect either wire to either of the two ter-
minals.
First Time Gateway Power Up
When the Gateway is first powered, the red light flashes
slowly (about once every 2 seconds), indicating the unit
is looking for a valid IP address (unit may take up to 90
seconds to find a valid address). If the unit finds a valid
IP address prior to 90 seconds, the red light flickers.
If the unit does not obtain a valid IP address after 90
seconds, the flashing rate increases to one flash per
second, and will attempt to find an IP address later.
The one flash per second flash rate indicates the Gate-
way is "configured". At this point you can reset the GW:
Reset the Gateway
At this point, the Gateway is mounted and connected to
the router (or the network) with the RJ-45 cable. Apply
power to the Gateway and the red light flashes slowly,
about once every 2 seconds. Before securing the Gate-
way housing cover, reset the Gateway memory--even if
the Gateway has never been used. Press and hold the
"RESET" button and the red light turns on continuously;
continue to hold the button and the red light will start to
flicker. Release the button and the red light will continue
to flicker.
"Resetting" the Gateway clears all memory and ensures
that any residual voltage or test data existing from the
factory is cleared from the unit. Always reset the Gate-
way for new installations; you can also reset the Gate-
way anytime after the Gateway is powered. Secure the
Gateway housing cover with the screws provided.