Technical data

05
HI-LINE Super RC
04
HI-LINE Super RC
7.0 Water Connections
G Connect unit to system flow and return pipes using the two
22mm isolating valves (see fig. 3).
G Ensure system is flushed in accordance with recognised best
practice and a suitable inhibitor is added to the system as
necessary.
G Open valves fully, check pipe connections for leaks and vent
the heat exchanger - see Commissioning Procedure.
5.0 Preparation
Before proceeding with the installation, unpack the carton
contents and check against the checklist below:
1. HI-LINE Super RC fan convector.
2. 22mm isolating valves (1 pair).
3. Instruction manual.
4. Warranty card.
5. Fixing kit (rubber mounts and cable gland).
6. Remote control handset.
6.0 Fixing
G Using the fixing dimensions below (see fig. 1), mark the fixing
hole positions on the wall.
G Drill and plug the wall for No. 8 x 40mm round head wood
screws ensuring that the wall plugs are suitable for the wall
type.
G Remove the backing from the self-adhesive washers and place
on screws with adhesive side towards the point.
G Tighten the screws into the wall leaving about 9mm
projecting.
G Press adhesive washers to the wall.
Remove the outer casing as follows:
G
Remove the screw securing each side panel (see fig. 2).
G Remove 2 screws at each side securing outer cover.
G Lift off the outer case.
G Fit chassis on to mounting screws and tighten.
Note: Before proceeding with pipe-work connections check that
the unit is level.
When water connections and electrical connections have been
completed and the unit has been vented, fit the outer cover and
secure with fixing screws.
Unit A
Dimensions (mm)
29-20 1360
25-18 1150
Fig. 1
Fig. 2 Case fixing screw positions
Fig. 3
5.06.07.0
Ceiling
150 min
each
side
A
53
103
63
275
77
144
92
20 min
100 max
82
117
55
69
55
21
23
201128
275
203
108
A
Mains cable entry
View on arrow
CEILING
20 mm
CEILING
100 mm
a) Rear pipe entry b) Top pipe entry
Unit A
Dimensions (mm)
29-20
25-18
1378
1168
21135 HiLine Super manual:Layout 1 19/3/08 10:32 Page 5