Process Status Monitoring
5-48 GAM Client v3.00 and WSAM User’s Manual
Rebuild Status
If a rebuild process is currently underway, open the Rebuild Status box as
shown in Figure 5-46 to monitor the progress of or cancel the process:
Figure 5-46. Select “Rebuild Status”
Figure 5-47. Rebuild Status Box
The Rebuild Status box (Figure 5-47) displays the progress of a physical
drive rebuild. The command rebuilds all logical drives that occupy any
portion of the targeted physical drive.
Click Cancel to stop the rebuild. You may need to check the Views menu to
see if Rebuild Status is still enabled. If so, you may need to cancel other
rebuilds as well.
Click Close to close the Rebuild Status box at any time.