Installation guide

Intelligent Battery Backup Unit
Manual No. 771971 B-7
Operation
Battery Conditioning Prior to Use
Battery conditioning is automatic. There are no manual procedures for
battery conditioning or preconditioning to be performed by the user.
Set-up – Enabling the Write-Back Cache
The write-back cache is enabled by toggling the write-back/write-through
mode switch. The write-back/write-through mode switch is accessed in
either DACCF or in GAM. Refer to the
DACCF Utilities Installation Guide
and User Manual
or the
Global Array Manager Installation Guide and User
Manual
for instructions on how to examine and change the mode switch.
Maintenance
No maintenance is required. It is recommended that the IBBU charge level
be periodically checked using the Gas Gauge function in GAM 2.10 (see the
Global Array Manager Installation Guide and User Manual
).