Installation Guide
28 www.mylenstairs.com
Infill Installation
1. At this point, the balusters should be fastened to the treads with the
handrail and the lowest line rail installed.
2. Start at the bottom baluster of the stair. Slide the rail cups (23) onto the
line rail mounts and partially tighten the set screws closest to the baluster.
They should be tight enough to where they can still rotate.
3. Take a coiled section of stainless line rail (24) and insert it through the line
rail cup. Tighten the set screw that is furthest from the baluster to lock the
line rail in place.
4. Slide a line rail cup down the line rail and secure to the next baluster.
Repeat this for the rest of the balusters and line rail. Tighten all the set
screws after the line rail is installed.
Hardware
Ⓤ
Parts
23 24 25
Tools