User manual
1
2
2
1
21
Modification reserved
• 19, rue de Rennes • BP 83221 • F - 35690 ACIGNÉ
10. IMPLEMENT UNHITCHING / HITCHING - MX C1, C2, C3u LOADERS
10.1 Implement unhitching
— Select a stable parking area.
— Lower the implement to the ground.
— Remove the safety pins, then the dumping-implement ram
link pins (1).
— Remove the safety pins, then the boom-implement link pins (2).
10.2 Implement hitching
— Mount the boom-implement link pins, then the safety pins (1).
— Mount the dumping ram link pins, then the safety pins (2).
Adjust the ram rod extensions as required.
11. LEVEL INDICATOR - MX C3, C3+, 30C+ LOADERS
The level indicator enables implement positioning when the loader is lowering. It is on the right side of the loader.
It can be adjusted according to the implement used.
Bucket parallel to ground
Indicator










