Specifications
Rockhopper 38 – Maintenance Manual
184
AP-74038, Rev. 1.1, 25/01/05
8.3 PERIODICAL SERVICES
This section describes the periodical services required for this machine. The periodical services ensure
stable printout quality of the machine. In the periodical services, some service parts may be checked,
cleaned or replaced.
Caution:
There are two parts of periodical service, namely the parts that can be replaced by the
end-user and the parts that need to be done by authorized Mutoh technicians.
8.3.1. Service by end-user
Perform periodical inspections according to the table below.
N° Part number Quantity Action
1 ME-24600 1 Change wiper
2 DF-41326 + DF-41327 1 + 1 Change absorbents in spitting box
Month Maintenance
Cycle
1 2 3 4 5 6 7 8 9 10 11 12
1
X X X
2
4x 4x 4x 4x 4x 4x 4x 4x 4x 4x 4x 4x
8.3.2. Service by authorised Mutoh technician
Perform periodical inspections according to the table below.
N° Part number Quantity Action
1 DE-49732 + DF-49733 1 + 1 Change printheads (black + colour)
2 MY-24115 1 Change flush box spare parts
3 MY-24114 + ME-24115 1 + 2 Change maintenance Station + waste connection tube
4 / Dust removal in fan area
5 / Global cleaning in maintenance station area
6 KY-33938 1 Change blade on press rollers
Month Maintenance
Cycle
1 2 3 4 5 6 7 8 9 10 11 12
1
X
2
X
3
X
4
X
5
X
6
X
Notes :
Above maintenance cycle is based on use:
8 hours / day, 5 days / week and 44 weeks / year.
If machine is used more, maintenance periods will come earlier.