Specifications
Spitfire 100 Extreme series printers – Operation Instructions
CHAPTER 4: PERIODICAL MAINTENANCE
57
AP-77200, Rev. 1.1, 05/07/07
Maintenance
4.2 DONE BY AUTHORISED MUTOH TECHNICIAN
This section describes the periodical services which should ONLY be done by an Authorised Mutoh
Technician. This periodical service ensures stable printout quality of the machine.
Perform periodical inspections according to the table below.
NR DESCRIPTION Frequency
13 Change absorbent in maintenance station 6 monthly
14 Change dampers 6 monthly
15 Change waste tubing from collector > waste bottle 6 monthly
16 Change spitting box + tube + L connection 6 monthly
17 Apply grease on head up-down cams 6 monthly
18 Apply grease on Y-motor belt 6 monthly
19 Apply grease on roller path carriage 6 monthly
20 Apply grease on capping station cams+ gears 6 monthly
21 Change maintenance station yearly
22 Change cap assembly maintenance station After 6 months
Notes
• All cleaning in “Ink areas” must be done with Mutoh water based cleaning solution.
• Above maintenance cycle is based on use:
8 hours / day, 5 days / week, 44 weeks / year.
If machine is used more, maintenance periods will come earlier.
Available kits for Authorized Mutoh Technicians only and their part numbers:
maintenance cycle Kit 6 months KY-80236
maintenance cycle kit 12 months KY-80237