Specifications

Operation Instructions Spitfire 65/90 Extreme
CHAPTER 4 : PERIODICAL MAINTENANCE
47 AP-77140 – Rev. 1.1 – 05/04/07
4.2 DONE BY AUTHORISED MUTOH TECHNICIAN
An Authorized Mutoh technician should check and replace some components of your printer on frequent
base (every 6 and 12 months).
Be sure to remind your distributor when the replacements should be done.
It is very important not to skip a maintenance intervention in order to maintain constant print quality and to
keep your warranty.
Please refer to the table below to know what the Authorized Mutoh technician should do.
Action
10 Change dampers
11 Change pumps (*)
12 Change tubes from pumps -> Waste bottle
13 Change spitting box + tube + L connection
14 Change capping station
15 Change cap assembly maintenance station
16 Apply grease on head up-down cams when needed
17 Apply grease on Y-motor belt when needed
18 Apply grease on roller path – carriage when needed (**)
19 Apply grease on capping station camm + gears when needed
20 Dust removal in fan area underneath print platform
Month Maintenance
Cycle
1 2 3 4 5 6 7 8 9 10 11 12
10
x x
11
x x
12
x x
13
x x
14
x
15
x
16
x x
17
x x
18
x x
19
x x
20
x x
Notes
All cleaning in “Ink areas” must be done with Spitfire Mild Solvent cleaning.
Above maintenance cycle is based on use:
8 hours / day, 5 days / week and 44 weeks / year.
If machine is used more, maintenance periods will come earlier.
Available kits for Authorized Mutoh Technicians only and their part numbers:
maintenance cycle Kit 6 months KY-80226
maintenance cycle kit 12 months KY-80227