Instruction manual
Operation Instructions Rockhopper 3 Extreme
CHAPTER 4 : PERIODICAL MAINTENANCE
39
AP-77150 – Rev. 2.0
4.2 DONE BY AUTHORISED MUTOH TECHNICIAN
An Authorized Mutoh technician should check and replace some components of your printer on frequent
base (every 6 and 12 months).
Be sure to remind your distributor when the replacements should be done.
It is very important not to skip a maintenance intervention in order to maintain constant print quality and to
keep your warranty.
Please refer to the table below to know what the Authorized Mutoh technician should do.
No Action Frequency
1 Changing the dampers
Every 6 months
2 Changing the spitting box + tube + L connection
3 Applying grease on the head up-down cams when needed
4 Applying grease on the Y-motor belt if needed
5 Applying grease on the roller path carriage if needed
6 Applying grease on the capping station cam and gears if needed
7 Removing dust in the fan area underneath the print platform
8 Changing the pumps
Every 12 months
9 Changing the tubes from the pumps to the waste bottle
10 Changing the maintenance station
Notes
• All cleaning in “Ink areas” must be done with Mutoh water based cleaning solution.
• Above maintenance cycle is based on use:
8 hours / day, 5 days / week and 44 weeks / year.
If machine is used more, maintenance periods will come earlier.
•
Please refer to the latest spare part price list for the part numbers of the maintenance kits.