Specifications

PJ-1614NXE PJ-2216NXE Maintenance Manual 3 Specifications
3-11
Step 5 : Remove the pin that is plugging the tube coming from the head.
Note that when removing the pin be careful, because jetwash can spurt out. Make sure not to
spill jetwash onto the HEAD circuit board.
Step 6 : Attach the tube to the connector of the sub tank. Make sure there are no bends in the tube.
Step 7 : Install the head circuit board assy and plug in the cables.
1 = tube
1 = HEAD circuit board assy
Step 8 : Repeat step 2 to step 7 for the other print heads.
Step 9 : Reinstall the covers.
NOTE
Perform the adjustment of the print heads.