Specifications

3 Specifications PJ-1614NXE PJ-2216NXE Maintenance Manual
3-10
3.6 Tube and Cable connection before powering ON.
WARNING
The unit is shipped with the tube between the print head and sub-tank, and
thermostat signal cable removed. Make sure to connect the tube and cable before
turning ON the power
For protection of the print head, this product is shipped with the tube between the head and sub tank
removed.
Before turning the power ON, perform the instructions mentioned below to install the tube.
Step 1 :
Remove the following covers :
Ø Cover upper left
Ø Cover upper right
Ø Y rail cover
Ø Front cover
Ø Carriage cover-1
Ø Carriage cover –2
Step 2 : Remove the following cables :
Ø Head heater cable assy
Ø Head cable assy
Step 3 :
Remove the screws that is holding the head circuit board assy to remove the board.
1 = Head heater cable assy
2 = Head cable assy
3 = HEAD circuit board assy
Step 4 : Remove the sub tank protection tube that is connected to he sub tank.
1 = Sub tank protection tube