Specifications
Section 20 00-02-0841
2013-01-14 - 3 -
Installation
Mounting
The Murphy EVS-2 must be mounted and set in accordance with the guidelines in this manual
to obtain the desired and specified performance and equipment protection.
Mounting occurs via a ½” NPT thread, the tightening torque is hand tight plus 2 to 3 turns.
When using a mounting bracket, ensure that mounting surfaces are smooth and flat.
Care must also be taken that the mounting surface is not subject to natural vibrations. Using a
high stiffness mounting surface prevents natural vibrations which cause measurement errors.
WARNING! Exceeding the torque specification will damage the
aluminum housing. If there is concern of the device becoming
loose due to excessive vibration, use a permanent thread locker
such as Loctite 271 (RED).
Figure
2
– Product Dimensions and Sensitivity Axis