Specifications
55
SITE MANAGEMENT • GENERAL SETUP
TECHNICAL SUPPORT 978-486-0086 • support@burk.com • www.burk.com
Meter calibration is done
through the Monitor
program. See page xx.
✍✍
The 2nd Upper and 2nd Lower options, not listed, function in
the same manner as the 1st Upper and 1st Lower. Refer to
the 1st Upper and 1st Lower instructions in the table above
when setting up the 2nd Upper and 2nd Lower options.










