Owner`s manual

17
Chapter 2 - Installation
4. With a Phillips screwdriver, tighten the power supply
screws.
Warning: If only a single power supply is used, then the
unused opening should have a power supply cover in
place.
5. If a second power supply is being installed, repeat steps 1
through 4.
6. Return to the rack installation procedure to continue
installing the rack.
Powering Up
Once the power switch is turned on, the green LED on the
power supply(s) should be lit and the modems perform a
diagnostic self-test, indicated by the speed LEDs flashing in
sequence for approximately two seconds. If none of the
modems have power to them or the power supply LED(s) is
not lit, check the power cord connection and check that the AC
outlet is live. If one of the green power supply LEDs on the
front of the rack is not lit, then one of the redundant power
supplies may be defective or not installed correctly (i.e., not
making proper contact).