Specifications

Generator Maintenance, Inspection and Repair Services Bid Number 6000001312
California Department of Corrections and Rehabilitation (CDCR) Exhibit A
SCOPE OF WORK
Page 16 of 18
XIII.
GUARANTEE
The Contractor shall guarantee all services performed by the Contractor’s service
technicians, including any replaced parts, for a minimum of ninety (90) days from the
date of service. If it is determined that a failure has occurred due to defective parts or
workmanship, the Contractor shall correct the failure at no additional expense to the
CDCR for parts, labor, or any travel expenses which may accrue. Correction shall occur
during normal State business hours upon request for service by the Institution Contract
Liaison or designee.
XIV.
ADDITIONAL PROVISIONS
A. ONE TIME SERVICE-REQUIREMENT
Calipatria State Prison (CAL) and Centinela State Prison
1. Exhaust Emissions Source Test For NOx and Stack Flow Rate
The Contractor shall perform exhaust emissions Source Test per Imperial County Air
Pollution Control District, Rule 400 Fuel Burning Equipment Oxides of Nitrogen on all
generators rated over 400 HP. This shall include the two (2) 2000 KW generators
and the 500 KW generator. Testing shall utilize U.S. EPA Method 7, 7A, 7C, 7E or
any other applicable EPA approved method for testing of NOx limits. Testing for
stack flow rates shall be determined using U.S. EPA Method 2, or any other
applicable EPA approved test method.
B. LOAD BANK TESTING
California State Prison-Corcoran (COR) and Chuckawalla Valley State Prison
(CVSP)
2. Special Load Bank Testing Requirements for CSP-Corcoran
At the California State Prison-Corcoran (COR) Load Bank Test shall be performed
annually and be conducted as follows:
a. Test Generator sets located at the Boiler Plant and the Wastewaster Plant, with
load banks for a minimum of two and one half (2 ½) hours;
b. Record date and note engine operating condition at:
1. one half hour, 25 percent
2. one half hour, 50 percent
3. one half hour, 75 percent
4. one hour, 80 percent
a. Test Generator sets located at the John D. Klarich Memorial Hospital, with load
banks for a minimum of five (5) hours;
b. Record date and note engine operating condition at:
1. one hour, 25 percent
2. one hour, 50 percent
Bid 6000001312
State of California
11/14/2013 2:35 PM
p. 46