Operation Manual

First connect the BID chip / KEY to the charger
using the adaptor lead. This automatically causes
the screen display shown here to appear.
If the charging parameters on the chip are OK,
press the ENTER button to prepare the charging/
discharging process. The further procedure is iden-
tical to that used for a manual start. This procedure
is described in Section 7.4.
While charging or discharging, the most important data is stored on the chip/key.
10. END OF A CHARGE / DISCHARGE PROCESS
The charger automatically finishes a charging or discharging operation precisely at the
correct time. The processor takes into account the charging parameters. The optimum
process is used for each type of battery.
10.1 DISPLAY OF THE CHARGE / DISCHARGE DATA
During a charge or discharge process, the values for that process are constantly shown
in the working display (see Chapter 5.1).
An audible signal will be heard upon
successful conclusion of the charging pro-
cess. As shown in the illustration opposi-
te, the most important data are shown in
the display.
Operating Instructions
Power Peak® Quad EQ-BID 230 V
19
Status indicator
Flashing ‘F’
(Finish)
Battery
type
Current battery
voltage
Charge or
discharge
current
Charge/dis-
charge time
Charged or
discharged
capacity
# 30 8196
43