Integration Instructions

1-01256 TRINITY F9+ Assembly Specification V2
Release-date: 2019-08-20 I
1 General references
This document may not be handed on to any third party without the explicit clearance from
MULTIPLEX.
This specification is written and designated for skilled users with substantial technical capabilities.
Indications of horizontal, vertical or longitudinal position are always meant in the direction of flight
at normal attitude.
Item descriptions in the text are written in bold italic letters.
The pictures do not necessarily show the latest version of parts and tools. This does not affect the
technical principal of the assembling procedure.
All D-Sub-connectors of the harnesses are installed with the wide side of the connector on top, the
narrow side on the bottom.
Persons assembling the Trinity have to wear antistatic shoes.
All finished Trinity Parts need at least 24h for evaporation. Do not store the finished parts in the
transport cases before, to avoid deposition of CA fumes on surfaces.
Consumables (e.g. CA glue, LOCTITE) may not be used after expiration date.
Excerpt from Trinity Assembly Specification V2