Operation and Maintenance Manual

MultiHaul™ Installation, Operation and Maintenance Manual
Page 19
2.1.1 Physical and Environmental Requirements
Each site should adhere to the following requirements:
There must be a clear, unobstructed line-of-sight between the radios.
The MultiHaul radio should be mounted on a fixed, stable, permanent
structure. A reinforced steel mounting pole is required, with a diameter
measuring from 2-4 inches (recommended). Note that the radio can be
mounted on poles from 1.5-12 inches using the provided self-locking bands.
Caution:
Do not mount the MultiHaul device on a structure that is temporary or easily
moved. Doing so may result in poor service or equipment damage.
The MultiHaul may be installed directly on a wall using its mounting kit.
You must mount the MultiHaul radio in a site that is easily accessible to
authorized personnel, and only authorized personnel.
Operating temperature: between -30° and +55°C.
Relative humidity: 0 to 100%.
Maximum altitude: 4,500m.
2.1.2 Cabling Requirements
Install the MultiHaul radio where network connections and optional power
cabling are ready for operation and easily accessible.
All cabling connected to the radio should be outdoor grade, with UV
protection.
PoE input Connect Ethernet cable to Eth1
PSE Output (PoE Out) for models with more than a single Ethernet port.
The voltage output at the PSE port is following the voltage at the PoE input
port. The total cables length, from the PoE device to the powered device
(PD) should not exceed 100 meters (PoE to first radio + first to second radio).
Note:
PSE Output available only is directly powered by PoE Injector/Midspan!
PSE Output is over 2 pairs. It means you can use the PSE Output to power up other
devices or other MultiHaul™ units, however, the MultiHaul that was powered by
PSE will not be able to power up other devices (no PSE Output).
You should use shielded outdoor Cat5e cables terminated with metallic RJ45
connectors.
In order to protect indoor equipment, you must install surge protection
circuits on all copper cables on their entrance to the building.