Operation and Maintenance Manual

MultiHaul™ Installation, Operation and Maintenance Manual
Page 18
2 Installing the MultiHaul System
This chapter describes how to perform the installation of a MultiHaul radio (Base Unit
or Terminal Unit), including:
Preparing the Site
MultiHaul Package Content
Unpacking the MultiHaul
Required Tools
Mounting the MultiHaul
Connecting the Cables
System LEDs
Installing the MultiHaul
Link Up Verification and Initial Commissioning
The installation of the MultiHaul radio is followed by initial system setup that will be
described in the next chapter.
Caution:
Avertissement:
The installation and maintenance of the MultiHaul link should only
be done by service personnel who are properly trained and certified
to carry out such activities.
L'installation et le service de la liaison MultiHaul™ ne doivent être
effectués que par du personnel technique correctement for et
certifpour effectuer de telles activités.
Minimum safe distance from antenna while radiating is 32 cm / 12.6
in (general public) or 14 cm / 5.5 in. (occupational) (according to
calculation done based on "Environmental evaluation and exposure
limit according to FCC CFR 47part 1, 1.1307, 1.1310; RSS-102, Safety
Code6).
La distance decurité minimale de l'antenne pendant le
rayonnement est de 32 cm / 12,6 po (grand public) ou 14 cm / 5,5 po
(professionnel), selon le calcul effectsur la base de « Évaluation
environnementale et limite d'exposition selon FCC CFR 47 partie 1,
1.1307, 1.1310 ; RSS-102, Code decurité6.
2.1 Preparing the Site
Carefully select and prepare each site to make device installation and configuration as
simple and trouble-free as possible. During site selection and preparation, always
consider the long-term needs of both your network and your applications.