Installation manual
10
Evaporator Opening Requirements
Evaporator Opening
The location of the unit mounting bolts and evaporator opening in the front
wall is critical.
VERIFY ALL DIMENSIONS BEFORE INSTALLING UNIT!
NOTE: It may be necessary to relocate the front corner clearance
lights to the corner radius of the trailer to prevent damage.
1. The evaporator opening must be square. The diagonal measurements
must be ±3.0 mm (0.12 in.)
2. The gasket surface around the opening must be at least 76.2 mm
(3.00 in.) wide, be flat ±3.2 mm (0.05 in.) and free of rivets, seams or
bolt heads.
DANGER: The front trailer wall must be structurally strong
enough to support the weight of the refrigeration unit!