User's Manual
ENTR Project
Jan, 01, 2017
An ASSA ABLOY Group Brand
Page 2
Rev
Description
Name
Date
Signature
1.0
Initial release
David Termin
06-04-15
2.0
Parag. 3.2- More detailed added.
David Termin
15-04-15
Parag. 4- Unified tables
Add Parag.2.3
Add Parag. 6-Key generation procedure
3.0
Add 'get status' command
07-05-15
4.0
Rearrange step by step procedure on parag. 3
03-06-15
5.0
Delete ,correct status register mapping
David Termin
05-08-15
6.0
Change parag. 4.2 and 3.3.8
18-01-16
6.1
Add FW update capability on parag. 3.3.1
David Termin
11-01-17
Product:
Integration Bridge
Customer:
Mul-T-Lock
APPROVALS:
Title
Name
Date
Signature
Checked By
R&D Manager
Approved By
R&D Manager
Quality Mgmt
Configuration Manager