User guide

www.muellerinc.com
E-15
ROOF SHEETING SEQUENCE
It is recommended that both sides of the ridge of a building be sheeted simultaneously. This will
keep the insulation covered for the maximum amount of time and the panel ribs can be kept in
proper alignment for the ridge panel. Check for proper coverage as the sheeting progresses. Note
panel-sheeting sequence below.
5
6
7
8
9
10
11
12
1
2
3
4
NOTE: If slippery substances are present on the roof panels wipe them clean
immediately to prevent slipping or falling. Workers should maintain a constant
awareness of their location relative to the roof edge.