User guide
877-2-MUELLER
E-4
SCREW ALIGNMENT (CONTINUED)
The template panel should be laid out for the proper screw locations in accordance with the
building erection drawings. Since pre-drilling will “hand” the panels, it will also be necessary to
select the end of the building from which the paneling is to begin. Before drilling the template
panel, it should be checked for proper hole locations against the building framework. Be sure there
is no excessive deflection in the purlins and girts.
2"
1
1
/4˝
3
/4˝
1
1
/2˝
1˝ - 1
1
/2˝
12˝ Lap
1˝
Dimensions subject to
variations. Check building
erection drawings.










