User guide

877-2-MUELLER
D-4
ROOF INSULATION (CONTINUED)
Double sided tape or contact adhesives can be used to hold insulation in place while the roof
sheets are being installed. Trim excess insulation to the edge of the eave trim and cut fiberglass
approximately 4 inches from end leaving only facing. Fold facing over end of blanket insulation to
seal the end.
Cut Fiberglass from Vapor Barrier
and Fold Vapor Barrier Over
Blanket
Insulation
Double-sided
Tape
#12 Self-Drilling
Wall Fastener
Allow room to
install sealant tape
and closure strip
Eave Trim
(Trim shape
may vary)
Eave Strut
Outside Closure
(Optional)
NOTE: Do not install more insulation on the roof than can be covered by roof
panels before the work period ends. Do not allow the insulation to become wet.