2x18 D.I.Y. Greenhouse Instructions Mueller D.I.Y. buildings are not engineered structures and do not meet any specific building code criteria. 877-2- MUELLER • www.muellerinc.
Mueller Mueller Inc Inc ‐ 6 x 9 DIY Back Yard Kit Instructions; Instructions; For For additional additional information, information, see see the the D.I.Y D.I.Y Installation Installation Video Video PG 2 Mueller, Inc. 12x18 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.Y Installation Video st PARTS LIST ng improvements, please refer to the parts list on the itemized invoice delivered with your building. All ciled on the inside ofRefer the channel, purlin, and rafters.
Mueller, Inc. 12x18 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.
Mueller, Inc. 12x18 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.Y Installation Video BASE LAYOUT (BC-1 AND BP-1) STEP 2 STEP 1 Insert BP-1 into BC-1 Add MKB-1 (Galvanized MKB-2) to top of BP-1 into BC-1 STEP 3 BP-1 (Base Purlin) NOTE: Leading and trailing edge of channels are overbent for a tight fit. Spread apart as needed to nest the purlin into the channel.
Mueller, Inc. 12x18 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.Y Installation Video MAKE SURE THE ASSEMBLY IS SQUARE NOTE: Mueller recommends the building be placed on leveling blocks (not included) to support the base channel and purlins. Mueller also recommends the building be anchored to the ground or foundation. The method of anchor is at the owner’s discretion. Make sure the assembly is square. Assembly is square when the corner to corner measurements are equal.
Mueller, Inc. 12x18 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.Y Installation Video ERECTING COLUMNS (C-1) Attach column to MKB-1 (Galvanized MKB-2) clip using 1/2"x1" Fin Head Bolts HINT: Add clips to top of columns before standing up.
Mueller, Inc. 12x18 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.Y Installation Video ADDING RAFTERS (R-1) Bolts should remain loose until EC-1 is installed Place one bolt as shown.
Mueller, Inc. 12x18 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.Y Installation Video ADDING EAVE CHANNEL (EC-1) Tighten bolts after EC-1 is installed.
Mueller, Inc. 12x18 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.
Mueller, Inc. 12x18 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.Y Installation Video 10 MAKE SURE THE ASSEMBLY IS SQUARE AND LEVEL R-1 EC-1 C-1 C-1 BP-1 BC-1 R-1 C-1 EC-1 C-1 C-1 R-1 BP-1 C-1 BC-1 Make sure the assembly is square. Assembly is square when the corner to corner measurements are equal. Use temporary bracing (not included) to hold assembly square if required.
Mueller, Inc. 12x18 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.
Mueller, Inc. 12x18 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.Y Installation Video ADDING DOOR, DOOR TRIM AND MID-GIRTS ( MG-1, MG-2 AND MG-3) NOTE: Bolt to inside of column leg -2 MG MG -1 -2 MG -2 MG MG -3 2 MG MG MKB-1 Clip -2 MG -3 Notch and bend trim as shown TOP VIEW Door Jamb Door J Trim TEK Screw MG TEK Screws MG -3 To attach MG-3, use TEK screws to go through door trim, door frame and girt.
Mueller, Inc. 12x18 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.Y Installation Video Eave Trim ADD WINDOW Start sheet 1" in past steel line. Sheet 1" above bottom of base channel. 13 Lap TEK Screw Use inside/outside closures behind drip trim DripTrim 1" NOTE: Sheets below window will need to be field cut for window assembly from 3'8" panels. Install one full sheet, then partial sheet. Insert window and flap flush to sheet.
Mueller, Inc. 12x18 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.
Mueller, Inc. 12x18 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.Y Installation Video TOP VIEW Endwall SHEETING SIDEWALL Sidewall Inside closure goes on the bottom and top of wall sheet. 1" NOTE: Start sheets 1" in from corner channel and start sheet 1" above the bottom of the base channel.
Mueller, Inc. 12x18 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.Y Installation Video SHEETING ENDWALL Sidewall TOP VIEW Endwall Inside closure goes on the bottom and top of wall sheet. 1" NOTE: Start sheets 1" out from corner channel and start sheet 1" above the bottom of the base purlin.
Mueller, Inc. 12x18 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.Y Installation Video SHEETING (START FROM A CORNER) NOTE: Make sure the frame is plumb and level, and tighten all bolts prior to sheeting. Repeat for each wall. TOP VIEW NOTE: For side with door, start sheets flush with J-trim on both sides of the door.
Mueller, Inc. 12x18 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.
Mueller, Inc. 12x18 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.Y Installation Video BACK SIDE WALL Roof to wall sheet alignment. Align major ribs from wall to major rib on roof. NOTE: Make sure panels remain square during installation.
Mueller, Inc. 12x18 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.Y Installation Video 20 36" 12" Lap TEK Screw SHEETING THE ROOF 12" 12" Lap Strap “on the bottom” Align roof sheets with wall sheets Skylight Screw Skylight Screw Skylight Screw Skylight Screw Skylight Screw Skylight Screw Skylight Screw Inside Closure Eave Trim SIDE VIEW 2.
Mueller, Inc. 12x18 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.Y Installation Video ROOFING TRIM DETAILS CAUTION: Use scaffold boards (not included) for support while installing roof sheets and trim.
Mueller, Inc. 12x18 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.Y Installation Video SKYLIGHT RIDGE ROLL INSTALLATION CAUTION: Use scaffold boards (not included) for support while installing roof sheets and trim HINT: S crew corner of ridge roll and middle first to maintain pitch. Install remainder of screws. Foam Block (under Ridge Roll) Ridge Roll Lap TEK Screw Outside Closure Roof Panel Foam Block closes the gap in between the closures.
Mueller, Inc. 12x18 D.I.Y. Greenhouse Instructions; For additional information, see the D.I.