Owner manual
Running a Transient Permeability Flow Test
286.31 Transient Permeability Pore Pressure Intensifier Operation
63
Purge and Fill the Pore Pressure Lines
1. Purge and fill the lower pore pressure line.
Turn the Pore Fluid Input valve to the Open position.
As soon as bubble-free fluid comes out at the triaxial cell’s lower pore
pressure port, go on to step 2.