Owner manual
Running a Transient Permeability Flow Test
286.31 Transient Permeability Pore Pressure Intensifier Operation
59
Running a Transient Permeability Flow Test
Performing a permeability flow test has five major tasks
• Fill the Pressure Intensifier
• Purge and Fill the Pore Pressure Lines
• Refill the Pressure Intensifier
• Prepare to Run the Test
• End the Test
Note If you have just done a complete purge of the 286.31, skip ahead to
Section 2.3.4. It begins on page 2-96.