Owner manual

286.31 Transient Permeability Pore Pressure Intensifier
36
Purging and Filling the Fluid Lines
Operation
2. Purge the low pressure Fluid Reservoir line of air and fill it with fluid.
If your triaxial cell doesn’t have a shut off valve for the upper pore pressure
line, plug this line at its triaxial cell output. Cap it or plug it with your finger
(or a helpers).
Turn the Permeability Output valve to the Open position.
As soon as the fluid entering the Fluid Reservoir becomes bubble-free, go
on to step 3.