Owner manual

286.31 Transient Permeability Pore Pressure Intensifier
32
Purging and Filling the Fluid Lines
Operation
Purge and Fill the Reference Volume 2 Lines
1. Prepare to purge the Reference Volume 2 lines of air and fill them with fluid.
Turn the Permeability Fluid Input 2 valve to the Open position.
Turn the Transducer Input 2 and Permeability Fluid Input 1 valves to the
Close position.