Owner manual

Purging and Filling the Fluid Lines
286.31 Transient Permeability Pore Pressure Intensifier Operation
29
Purge and Fill the Balance and Upper Pore Lines
1. If your triaxial cell has a upper pore pressure valve, open it now.
2. Prepare to purge the Transducer Pressure Balance and upper pore pressure
lines of air and fill them with fluid.
Turn the Transducer Input 1 and Transducer Input 2 valves to the Open
position.