Owner manual
286.31 Transient Permeability Pore Pressure Intensifier
26
Purging and Filling the Fluid Lines
Operation
Purge and Fill the Reference Volume 1 Lines
1. Prepare to purge the Reference Volume 1 lines of air and fill them with fluid.
Turn the Permeability Fluid Input 1 valve to the Open position.
Turn the Transducer Input 1 valve to the Close position.