User Manual
Table Of Contents
- Introduction
- Facility Preparation
- Preparing to Receive the System
- Space Requirements
- Foundation Requirements
- Floor Loading Considerations
- Mechanical Shock/Vibration
- Electrical Power Distribution
- Grounding Requirements
- Console Control Power
- Radiated Emissions
- Fixture and Specimen Handling Considerations
- Acoustics
- Temperature
- Heat Dissipation
- Altitude
- Relative Humidity
- Leveling System Components
- System Component Specifications
- Additional Considerations

Copyright information © 2009-2010 MTS Systems Corporation. All rights reserved.
Trademark information MTS is a registered trademark of MTS Systems Corporation within the United
States. This trademark may be protected in other countries.
All other trademarks or service marks are property of their respective owners.
Publication information
Manual Part Number Publication Date
100-209-144 A January 2009
100-209-144 B May 2010