Instruction Manual
AnnuallyBiweeklyWeeklyDailyCalendar Time using 8 hour Running
Time Rate Per Day
2,0001,500100050080408Running Time-Hours
MTSMTSMTSMTSEnsure that the turning parameters are
appropriate and the system is stable.
MTSMTSMTSMTSEnsure that the E-Stop is in working
condition. (If applicable.)
MTSMTSMTSMTSCheck the visual and audible response to a
full stroke waveform.
MTSMTSMTSMTSCheck the displacement control and valve
balance.
MTSMTSMTSMTSCheck the valve dither response.
MTSMTSMTSMTSVerify that the High/Low Velocity Switch light
turns on when the load unit is running on
high.
MTSMTSMTSMTSVerify that low velocity causes a program
interlock.
Grips
MTSMTSMTSMTSComplete a cursory check of the grips and
the grip controls.
MTSMTSMTSMTSEnsure that the grip supply connections are
dry.
MTSMTSMTSMTSEnsure that the grip seals are dry.
MTSMTSMTSMTSEnsure that the grip action is acceptable.
MTSMTSMTSMTSLubricate the grip inserts.
Other Maintenance Tasks
The following table lists the recommended interval for each of these procedures.
Load Unit Maintenance Intervals
When to Do ItWhat to Do
Before the start of each day’s testing.Make daily inspections.
MTS Landmark™ Floor Standing Load Units Product Information 79
Maintenance