Instruction Manual

Lift the Load Unit Upright
DescriptionItem
Crane Travel1
30° Maximum2
4. Move the load unit to its final position.
Before you move the load unit, ensure that:
The floor where the load unit will sit can bear its weight.
The path to where the load unit will sit is clear and uncluttered.
The area where the load unit will sit is clean and well lit, with all hoses and cables moved out of harm’s
way.
The eyebolts are tight.
The crosshead is manually locked.
Lift the load unit only as high as necessary.
5. Place the load unit onto the isolation pads or airmounts.
40 MTS Landmark™ Floor Standing Load Units Product Information
Installation