Owner's manual
DescriptionItem
NoString
NoArray
Description
9. Select the Use Calculation check box and click Edit.
The Calculation Editor window opens.
10. Click CycleCount, click Insert, and click OK.
CycleCount appears in the Calculation panel. Cycle Count is a System variable with a default value of 0.
You cannot edit its definition.
11. Click New Variable, type FatigueCycles, and click OK.
12. Type the following values into the table.
FatigueCycles
DescriptionItem
Failure CycleCategory
FatigueCyclesIdentifier
Fatigue CyclesDisplay Name
0.000Default Value
CountDimension
countUnit
NoString
YesArray
Description
13. Select the Use Calculation check box and click Edit.
The Calculation Editor window opens.
14. Create the Cycle[*].PeakValleyCycle calculation and click OK.
The PeakValleyCycle variable must be mapped in the Data Acquisition Editor before it can be used in this
calculation.
15. Click New Variable, type FatigueCycles, and click OK.
16. Type the following values into the table.
60 MTS TestSuite™ Fatigue Analyzer User Guide
6.0 Data Analysis