User guide
Lifting and Moving Instructions
MTS Criterion™ Series 60
23
Lifting and Moving Instructions
Contents Handling the Load Fame 25
Unloading 25
Moving the Load Unit 26
Moving the Load Frame with a Forklift 27
Moving the Load Frame with an Overhead Crane 28
Securing the Load frame 29
Handling the Integrated Operations Platform 31
Unloading 31
Moving the Integrated Operations Platform 31
Handling the Steps 32
Overview
To reliably and safely use your equipment, handle it according to the instructions.
Check for any crate damages upon the machine arrival. If you find any damage,
contact MTS as soon as possible and describe the details in the Commissioned
Shipment Receipt.
The load frame is heavy.
The load frame can seriously hurt you and damage your equipment.
Do not allow the load frame to drop or topple.
Make sure that your chains, slings, and crane have a working capacity greater
than the load frame’s weight (see the following table).
Make sure that the lifting hoist rings are tight.
Make sure that the crosshead locking bolts are fully tightened.
Lift the load frame only high enough to clear its pallet.
Operate the crane smoothly to prevent breaking shocks to the sling.