Installation and Commissioning Plan Manual

Installation and Commissioning Plan
8 Criterion
TM
Series 60
INTRODUCTION
This Introduction provides a brief overview of the supplied equipment. It is not
intended as a substitute for formal training. MTS strongly recommends formal
classroom training at the MTS facility in hardware and software operation and
maintenance.
A4.0 System Introduction
Item Description
Performed
On Site
A4.1
System components:
- System Start-up and shut down.
- Emergency and safety features - Emergency Stop,
crosshead limits, test area enclosure, and location
of circuit breakers/fuses.
- Connecting transducer, which includes methods of
safe handling, selecting capacity for proper
application, and calibrating.
- Login into TestWorks

A4.2 Using TestWorks, the basics.
- Accessing and using the Help System.
- Set up user login names & manage the data.
- Configure the user interface such as the
appearance of meters, graphs, and sash positions.
- Setting up additional transducers within the
TestWorks software.