Installation and Commissioning Plan Manual
Installation and Commissioning Plan
Criterion
TM
Series 60 7
Item Description
Performed
On Site
A3.3
Additional Purchased Options:
- Calibrations: See section C1.0 if purchased.
- System performance demonstrations: See section
C2.0 if purchased.
- Custom test method creation: See section C3.0 if
purchased.
- On-site computer integration: See section C3.0 if
purchased. On-site computer integration does not
include peripheral or network integration. If time
permits, at the end of the installation, the FSE will
assist your Information Services Technician with
the integration of peripherals and network
capabilities. The FSE is not trained in information
systems troubleshooting techniques and is not
responsible for compatibility issues regarding the
integration of devices other than those required for
communication with the MTS supplied controller.